Ottawa Home Reno613 555-0112

Bathroom renovation

Full bathroom rebuilds and new basement bathrooms, with waterproofing done right.

A bathroom rebuild in the same layout usually does not need a permit. Adding a bathroom, or moving the toilet, tub or shower drain, does, because it changes the plumbing.

The shower is where most bathroom failures start. Walls and floor get a waterproofing membrane behind the tile, sloped properly to the drain, and the exhaust fan is vented outside, not into the attic.

A new basement bathroom often needs the floor cut for drains, or an up-flush system where the main drain is too high. We check the drain depth before quoting.

Expect three to five weeks for a full bathroom once work starts, depending on tile and custom glass.

Tell us about the room or the house. We reply within one business day and book a site visit.

Call us 613 555-0112 Request a quote

All services

Kitchen renovation

Layout changes, cabinets, counters, plumbing and electrical, done in a planned order.

Basement finishing

Permitted basement finishing with proper moisture control, insulation, egress and alarms.

Bathroom renovation

Full bathroom rebuilds and new basement bathrooms, with waterproofing done right.

Additions and structural changes

Rear additions, second storeys, and wall removals with engineered drawings and permits.