Layout changes, cabinets, counters, plumbing and electrical, done in a planned order.
A kitchen renovation starts with the layout. Keeping the sink, range and fridge where they are keeps the cost down. Moving them means new plumbing, new circuits and often a permit.
Removing a wall to open the kitchen to the dining room is common in Nepean and Orléans houses. If the wall is load-bearing, a beam is sized by an engineer or a qualified designer and a building permit is needed before the wall comes out.
The work runs in order: demolition, rough plumbing and electrical, inspections, drywall, flooring, cabinets, templating and installing counters, then the backsplash and fixtures. Expect six to ten weeks for a full kitchen once work starts, with the counters taking one to two weeks from template to install.
Plan where you will cook while the kitchen is out. A temporary sink and a plug-in cooktop in the basement or dining room makes the weeks easier.
Layout changes, cabinets, counters, plumbing and electrical, done in a planned order.
Permitted basement finishing with proper moisture control, insulation, egress and alarms.
Full bathroom rebuilds and new basement bathrooms, with waterproofing done right.
Rear additions, second storeys, and wall removals with engineered drawings and permits.